Allow about 1 foot 0 30 m of the felt to hang over the hip.
How to felt a hip roof.
Tile types such as marley and redland are explained explaine.
Adjust the felt as you roll it making sure that it s straight with no bubbling.
For hip type shed roofs which include slopes on all 4 sides begin at the square hip at the top of the roof.
Each of the four sides of the roof slope downward there are no upright or vertical parts no gables etc on a hip roof.
Start the roof felt at one bottom corner of the roof.
As already mentioned earlier replacing the shingles of a hip roof is going to take a lot more time and effort on your part.
The roof decking should be completely clean and dry.
When the time comes a metal fascia will tuck up underneath the drip edge to cover the fascia board.
Running a flat bottom shovel along the roof decking will help you find any stray nails that should be pulled.
How to install asphalt shingles on a hip roof.
Ideally the roof should be done when there is a forecast for several days without a lot of rain.
Any stray roof tacks pieces of old felt or general debris should be cleared off.
Where the roof meets a wall lap the felt up 4 inches if possible.
A hip roof may be virtually square sloping from one main roof point downward on four equal sides or it may have an extended roof ridge and additional hips designed by the architect.
Tack it in place at the corner with the end flush with the end of the roof and the bottom edge of the roll right along the bottom of the roof.
Since this is a hip roof they installed a drip edge along the entire perimeter overlapping joints by a few inches.
How to combat roofing prices by felting your roof battening the felt and roof tiling yourself.
Once you get the hang of installing roofing felt over the hips it s not much more involved than installing the felt on a gable roof.
A hip roof design refers to a roof where the roof sides slope downwards from a middle peak with the rafter ends meeting the exterior walls of the house.
Now that your roof is all ready for a shingling job let us come to the most important section of our article viz.