Flat roof repair turbo poly seal 144 608 views.
How to felt a flat roof with cold adhesive.
Fold back the felt on to the top of the roof.
We had a problem with our shed workshop flat felt roof leaking and needed a quick repair.
You wan walk over the roof to remove any air bubbles that may form.
Laying the first underlay felt.
Align measure and cut it to length.
Simply prime peel and stick.
Following the manufacturer s instructions apply the adhesive to the first nailed layer.
The substance itself is made from bitumen which comes from the distillation of crude oil that has been either mixed with sand or crushed limestone.
You will be placing the second layer of felt over this.
There needs to be an overlap in the felt to help increase the water tight quality.
Obtar sandhu july 2012.
It s best to start nailing in the center and work out from there.
Apply adhesive so the folded felt will be bonded together.
This video is showing the necessary steps for a perfect and easy installation of our flame free self adhesive roofing system.
Roll out the felt.
Bituminous felt is a form of waterproof sheeting that is used to cover flat roofs or as an underlay beneath slate or tile roofing.
Tips on how to use cold adhesive on flat roof felt.
Complete the finishing touches.
Roll the felt so that it overhangs the edge by 2 inches.
Weston installing a rubber roof over gravel roof.
Roll your felt out on the roof and cut it to fit with a utility knife.
If have been trying to put a new piece of green top felt on a flat roof and been using a cold adhesive with brush but it does not stick together need help.
Answers will appear here when the question above is answered.
Laying the top bonded layer of felt.
Let it stand for about 30 minutes and then using galvanized nails and your hammer nail down the first layer.
Preparing the roof for the felt to be laid.
When the lengths of felt forming the gutter strip are nailed in place fold back the felt with the fold below the top of the gutter.
The basics of these steps are.
Laying the second boded underlay felt and adding any gutter drips.
Cold adhesive applied roof system maintenance.
Paint a thin layer of adhesive over the first felt layer.