Metal roofing is also available in the form of shingles.
How to cut metal roofing material.
How to cut metal roofing method 1 of 3.
When you re ready to cut place the sheet onto a flat wide and sturdy work surface.
Use snips if you need to make short cuts.
If you don t mind working by.
In our test it cut through rebar like a hot knife through butter.
Planning is integral to.
Find a perfectly flat and steady work surface to cut the material on.
Because you have to control the panel while cutting the sheet.
Plan ahead prepare the metal and measure before you cut.
Just like with measuring the key to this step is going slowly and taking your time.
The cheapest way to cut metal roofing is with a pair of tin snips.
First off you need to plan your cuts before you do anything else.
Find the length that you need to cut it to and use the tape measure to relate this to the metal sheeting itself.
The best tin snips are good for cutting any edge of corrugated iron that is going to be seen as they are easy to control when cutting.
Place the corrugated metal sheet flat down on the surface with the underside facing up.
The ideal tool to perfectly cut corrugated metal is power shears.
Hand holding marker pen marking measurement on a metal stud.
How to cut metal roofing plan and mark your cuts.
Marking the metal for cutting.
Check the points you need to cut the metal roof clearly.
Cut metal with your circular saw.
After reclining the surface you need to estimate the cutting line by using a mark and a calibrated tape.
Working with tin snips and shears.
First of all measure your roof and order the sheets the exact length you need.
There s no rush to.
Lay the roofing sheets on a flat surface with the underside up.
Using a circular.
You want a pair of straight cuts or left or right handed pair for cutting both straight and around corners.
You may need to cut panels to fit angles using a circular saw with a metal saw blade.
Push through tough patches.
Then you put the metal roof on the sturdy surface and switch the underside face of the roof.
Use a permanent marker to mark the point where you want to start cutting.
Thick using a ferrous metal cutting blade.
Hot metal chips will fly everywhere.
Lay the starter row of metal shingles at the drip edge and affix to the roof with metal roofing nails.
Make sure that they perfectly align with your measurements and remember that being even a tiny bit off can cause irreparable damage to your corrugated sheeting.